Transmission Master Plan System of Sumatra Study

Transmission Master Plan System of Sumatra Study

Transmission Master Plan System of Sumatra Study Timing: March to October 2017 Financing: PT PLN CLIENT/Beneficiary: PT PLN System Demand: 70GW System Capacity 85GW The Indonesian energy utility PT PLN (the Indonesian energy utility) contracted Mercados-Aries...
Contributing to floating PV in Vietnam

Contributing to floating PV in Vietnam

Contributing to floating PV in Vietnam Detailed engineering revision Equipment manufacture and installation inspection 50 MWInstalled capacity: 50 MW Wire connection by local personnel trained by the Contractor Commissioning supervision Technology transfer and...