Hybridizing CSP MASEN

Mercados Aries International carried out technical advisor activities for the development of two CSP-PV hybrid plants in Morocco during the tender phase.

The works included a first review of the request for qualification documents, the minimum functional specifications, the contracts as the power purchase agreement (PPA), and other tender documents. Secondly, MAI was involved in the preparation and review of the technical proposal for the EPC contractor.

In addition, MAI optimized the plant from technical and economic points of view, estimated the CAPEX/OPEX and carried out a bankable estimation of energy yield based on the final plant configuration and the basic engineering design.

 

Contact us

Please feel free to contact us for any request or information

Sergio Galarza

Sergio Galarza

Unit Director

.rv_buttonSergio.closed:after {content:"\33";} .rv_buttonSergio.opened:after{content:"\32";} jQuery(document).ready(function() { // Hide the div jQuery('#revealSergio').hide(); jQuery('.rv_buttonSergio').click(function(e){ e.preventDefault();jQuery("#revealSergio").slideToggle(); jQuery('.rv_buttonSergio').toggleClass('opened closed'); }); });


Jesús Barriuso

Jesús Barriuso

Head of Consultancy

.rv_buttonJesus.closed:after {content:"\33";} .rv_buttonJesus.opened:after{content:"\32";} jQuery(document).ready(function() { // Hide the div jQuery('#revealJesus').hide(); jQuery('.rv_buttonJesus').click(function(e){ e.preventDefault();jQuery("#revealJesus").slideToggle(); jQuery('.rv_buttonJesus').toggleClass('opened closed'); }); });


Germán Nieto

Germán Nieto

Head of Transmission

.rv_buttonGerman.closed:after {content:"\33";} .rv_buttonGerman.opened:after{content:"\32";} jQuery(document).ready(function() { // Hide the div jQuery('#revealGerman').hide(); jQuery('.rv_buttonGerman').click(function(e){ e.preventDefault();jQuery("#revealGerman").slideToggle(); jQuery('.rv_buttonGerman').toggleClass('opened closed'); }); });